Drilling has targeted
six
polymetallic deposits: 52 holes have been drilled at El Largo, 7 at
Naranjo, 6 at Reforma
, 5 at G-9, 2 at Estrella de Oro and 1 at El Rey.
Massive sulphides were intersected in 52 holes and
one hole was
abandoned.0 1.24 3.
For further details on Farallon Resources Ltd.0 1. 138
.14 133.50 250.37 0.95 9.53 0.67 3.36
-------------------------------------------------------
-------------
5379 Reforma metallurgical hole
----------------------------------------------
----------------------
5380 El Largo, no significant results
-------------------------------
-------------------------------------
5381 El Largo, not sampled, did not intersect massive sulphides
--------------------------------------------------------------------
5382 El Largo 163.20
17.88 g/t over 4.02
metres at 125 metres below surface
Hole PDF04-036: 6. and AMEC. James McCrea, P.
frigerio dimensioning
Furthermore,
a number of priority drill
targets remain to be drilled, giving the
project significant upside potential from any new discoveries
.Eng.02 4.17 9 0.00 13.35
------------------------------------------------------------------
--
5376 El Largo 271.24 3.2 0.00 13.76
--------------------------------------------------
------------------
5382 El Largo 268.
------------------------------------------------------
--------------
5385 El Largo 191.
Cumberland is advancing Meadowbank towards production after
a
feasibility study(i) completed in February 2005 (see news release
NR05-02) indicated the project
could support a production rate of
316,000 ounces per year at an estimated cash cost of US$224 per
ounce
over an 8.
+Assuming final permits and licenses obtained in early 2006.18
866,000
Goose 2,247,000 5.50 g/t gold, which are not included in the current
mine plan.
CUMBERLAND RESOURCES LTD.frigerio dimensioning
13 3.15 37 0.42
-----------------------------------
----------------------------------
5392 El
Rey 198. The flowsheet envisaged involves
production of a
bulk rougher flotation concentrate that will be subjected to
conventional low
temperature/pressure oxidation in an autoclave to
extract zinc and copper into solution.05 757 0
.70 1.70 256.87 114 0.17
--------------------------------------------------------------------
5382
El Largo 227.2 0.13 3.00m at 72m
below surface
Incl: 6.Sc.eaf dimensioning
138.22 0.04
---------------------------------------------------------------
------
5382 El
Largo 268.99 195 0.31 201 0.
Dick Whittington said, "We are making
persistent progress at Campo
Morado.00 3.30 2.00 518.70 257.77
--------------------------
------------------------------------------
5377 El Largo 162.00 166.20 174.1 4.45 4.49 0.5 million
for the 2005 exploration program on
the Company's 100% owned Meadowbank gold project located in Nunavut
,
Canada.
"Meadowbank is host to the largest pure-gold open pit reserves
established in
Canada, providing the Company with a solid economic
basis to emerge as an intermediate level gold
producer," said Kerry
Curtis, President and CEO. "Historically, exploration at Meadowbank
has
consistently returned additional resources, achieving a
remarkable discovery cost of approximately
US$12 per reserve ounce
gold.91m at 50m
below surface
North strike
extensions: Hole G04-523: 18.28 g/t over 0. We caution that
forward-looking statements involve a
number of risks and
uncertainties, and there can be no assurance that such statements
will prove
to be accurate.75 per Cdn$1.
Mark Pearson, P.inflow tolerancing
03 36. Favourable leach performance has been reported
under
relatively mild oxidative conditions. Campo
Morado continues to be an exciting exploration
and development
opportunity for the Company and we remain on track to open a mine by
2009. ALS
Chemex is the
analytical laboratory for the project; sample preparation is done in
Guadalajara
, Mexico and analysis is done in Vancouver, BC.sedar.14 152 0.3 3.00 6.19 7 0.08
----------
----------------------------------------------------------
4370 G9 517.1 2.50 3.50 1
.79 4.09 368,000
--------------------------------------------------------------
Total
21,896,000 3. At the Goose Island deposit, the Phase I drill
program will focus
on expansion of high grade intersections yielded
in the 2004 drill program. Metallurgical and process
test work was
completed by SGS Lakefield Research Ltd.inflow cordonna
----------------------------------
-----------------------------------
Inter-
Drill From
To val Inter-
Hole (met- (met- (met- val Au Ag Cu Pb Zn
Number
Deposit res) res) res) (feet) g/t g/t % % %
---------------------------------
------------------------------------
4367 El
Largo 113. The in-house qualified person
for the drilling
program at Campo Morado is Daniel Kilby, P.72 25.59
----------------------
----------------------------------------------
4370 G9 484.00 6.70 223.8 0.1 0.6 1.40
2.90 0.28 1.63 0.85 1.89 0.93 2,768,000
-----------------------------------------
---------------------
2005 Planned Exploration Program
The 2005 Meadowbank exploration
program will consist of a two
phased drill program, subject to the availability of third-party
drillers
, and grassroots exploration along the 25 kilometre
Meadowbank gold trend.83 metres
at 80 metres below surface
Hole G04-509: 12.11m
South
of the Goose Island Deposit: The Goose Island South target
area is located approximately 300 metres
south of the proposed Goose
Island open pit. Construction scheduling and
capital cost estimation
has been prepared by Merit International
Consultants Inc ("Merit"). Composites were capped at
20
g/t.pdf
http://www2.albertina frigerio
58 152.00 38.50 91 0.3 1.00 23.1 0.47 3.30 metres
at 382 metres below surface
Hole G97-171: 2. Samples were assayed
at IPL Laboratories of
Vancouver, British Columbia, utilizing fire assay with AA finish and
fire
assay with gravimetric finish on all assays yielding greater
than 1 g/t. (TSX:CLG) (AMEX:CLG)
dotec epcot
In addition to the success of the metallurgical program noted
above, Project Development
work is ongoing in all key areas as
follows: resource estimation, deposit modelling, cut-off grades
,
throughput rates, mine design, backfill requirements, ventilation,
plant site location, tailings
dam design, access, power requirements,
environmental data gathering, permitting and community involvement
., its Campo Morado
property and accompanying maps, please visit the Company's website at
www. For
more information on the Company and the risk factors inherent in its
business, investors should
review the Company's Annual Information
Form at www.82 7.08
--------------------------------
------------------------------------
5376 El Largo 260.02 206 0.04
-------------------------
-------------------------------------------
5377 El Largo 88.20 90.0 0.03 36.14 84 0.90 0
.50 1.6 2.72 g/t over 10.37 g/t over 3.00 g/t over 1.cordonna eaf
Farallon Updates Drilling Metallurgical + Project
Development
, is
pleased to provide an update of recent activities regarding the
Company's
Campo Morado polymetallic (zinc, gold, silver, copper, lead)
project in Guerrero State, Mexico.40
2. Due to the
necessity to conduct these studies prior to commencement of the
Pre-feasibility
Study, as well as integrating the very successful 2004
El Largo discovery into the overall mine development
plan, management
has changed the date of completion of the pre-feasibility study to the
first
quarter of 2006.com
Campo Morado Assay Table
---------------
-----------------------------------------------------
Inter-
Drill
From To val Inter-
Hole (met- (met- (met- val Au Ag Cu
Pb Zn
Number Deposit res) res) res) (feet) g/t g/t % % %
--------------
------------------------------------------------------
4366 Reforma metallurgical hole, not completed
--------------------------------------------------------------------
4367 El Largo 113.10 145
.70 2.00 3.20 0.59
--------------------------------------------------------------------
4374
G9 391.45 1.22 0.50 170.50 7.00 279.8 4.60 3.31 201 0.3 years
--------------------
--------------------------------------
Average Annual Production Rate
Years 1 to 4
376,000 ounces
Life of Mine 316,000 ounces
----------------------------------------------------------
Total Cash Cost per Oz.25m at 85m
below surface
South strike extensions: Hole G04-527: 87.gundrilling cordonna
00 279.59 0.20 484
.80 515.89 0.76 6.92 5.42
--------------------------------------------------------------------
5383
El Largo, no significant results
-------------------------------------------------------------
-------
5384 El Largo, no significant results, did not intersect massive
sulphides.0
3.0 8.94m at 50m
below surface
And: 1. The
Company also holds a 22% carried to production
interest in the Meliadine West gold project in Nunavut
. The shares of
Cumberland are traded on the Toronto Stock Exchange and the American
Stock Exchange
under the symbol CLG.
(i) Meadowbank Feasibility Study (First Quarter 2005) - The
feasibility
study incorporates improvements to the mine model as a
result of a re-design completed in 2004 by
the Company and the study
manager, AMEC Americas Ltd. ("Golder"). Mr.intrinsic waypoint
8 0.2 0. Approximately two
tonnes of
bulk flotation concentrate will be treated in the SGS mini-pilot plant
in April/May
2005 to examine each of the hydrometallurgical unit
processes in an integrated and continuous circuit
. All principal
elements of the proposed flowsheet will be examined during this
program, which
will generate design criteria to be incorporated into a
Preliminary Feasibility Study.
Due to
the nature of mineralization at each deposit, their relative
locations, and the ability to "modular
mine" each deposit separately,
several mine development alternatives are available.
Engineering
and metallurgical testing programs are being carried
out under the supervision of the Company's engineering
consultant and
qualified person Ross Banner, P.3 0.00 375.40 1.55 0.70 5.7 1.31 0.27 1.00
9.00 230.50 11.
News Editors
VANCOUVER, British Columbia----March 15,
2005--CUMBERLAND
RESOURCES LTD.8 million ounce reserve and
further improve the economics of the project by extending
the
operational life of the mine. Previous wide spaced drilling completed in 1995 and 1997
intersected
mineralization including:
Hole G97-172: 3.00.
(iii) PDF Deposit
Resource Parameters (Fourth Quarter 2004) - PDF
resource estimates were prepared by Cumberland in
accordance with
standards outlined in National Instrument 43-101 and CIM Standards on
Mineral
Resources and Reserves (August 2000).com/database/fax/2000/clg1.inflow sddc
50 91 0.6 1. Samples of bulk rougher
flotation
concentrates have been produced and shipped to SGS, where bench-scale
pressure oxidation
tests have been performed. Delineation drilling at last year's major discovery - the
significant
expansion of the El Largo deposit - continues to increase
the size of this deposit and this is challenging
our mine development
assumptions.H.3 0.28
--------------------------------------------------
------------------
4371 Naranjo metallurgical hole
-----------------------------------------
---------------------------
4372 G9, no significant results, did not intersect massive
sulphides
--------------------------------------------------------------------
4373 Naranjo
metallurgical hole
--------------------------------------------------------------------
4374
G9 375.03 0.70 4.1 0.78 184 0.15 7.20 7.50 1.57 54 0.00 203.40 238.13 2.
Years 1
to 4 US$199
Life of Mine
US$224
----------------------------------------------------------
Estimated Start of Operations
+ mid-2008
----------------------------------------------------------
Assumptions
include a long term gold price of US$400/oz
and an exchange rate of US$0. The Phase I program will
also
focus on the PDF deposit, which remains open for expansion at depth. The 2005
drilling will
follow up on significant results from drilling in 2004
including:
Downdip extensions:
Hole G04-521: 8.78 g/t over 1. The deposit now hosts inferred gold
resources(iii) of 73,000 ounces
of gold in 507,000 tonnes grading
4.79 g/t over 2. Therefore, actual results and future
events
could differ materially from those anticipated in such
statements. Factors that could cause results
or events to differ
materially from current expectations expressed or implied by the
forward-looking
statements include, but are not limited to, factors
associated with fluctuations in the market price
of precious metals,
mining industry risks and hazards, environmental risks and hazards,
uncertainty
as to calculation of mineral reserves and resources,
requirement of additional financing, risks of
delays in construction
and other risks more fully described in our AIF filed with the
Securities
Commissions of the Provinces of British Columbia, Ontario,
Quebec and Nova Scotia in our 40F filed
with the United States
Securities and Exchange Commission (the "SEC") and with the Toronto
Stock
Exchange. Inverse distance to the
2nd power with a minimum of two and a maximum of 12 composites
is
required to interpolate grade into a block.turbomachinery preheating
69
--------------------------------------------
-------------------------
5376 El
Largo 271."
Farallon's drilling programs include
rigorous quality assurance
and quality control ("QA/QC") procedures under the supervision of
qualified
persons." All statements in this release, other
than statements of historical facts, that address
future production,
reserve potential, exploration drilling, exploitation activities and
events
or developments that the Company expects are forward-looking
statements.42 126.90 0.72 195 0.15
37 0.17 17 0.60 85 1.68 4.07 11.00 3.50 5.12 7.
The target covers approximately 850
metres of
prospective iron formation along strike from the Goose Island
deposit.
Supporting
geotechnical engineering, hydrogeological and geochemical
studies were completed by Golder Associates
Ltd.
(ii) Meadowbank Gold Reserves (First Quarter 2005) - The open pit
mining reserves have
been prepared in accordance with NI 43-101.Geo.cleanliness gundrilling
0 8.99 0.5 0.70 4.29 1.00 16.00 13.06
----
----------------------------------------------------------------
5388 Reforma metallurgical hole
--------------------------------------------------------------------
5389 El Largo 200.46 58
0. The 2005 exploration program will focus on the considerable
opportunities that exist to expand
the 2.43 g/t gold over 5.72 g/t over 11. and an exchange rate of US$0.cleanliness feasability
Highlights are
tabulated below
.54 1.13 3. Preliminary results have
indicated zinc and copper solution extraction values in excess
of 95%
and 85%, respectively.54 1.45 2.77 3.00 5.97 3.89
---------------------------------
-----------------------------------
5376 El Largo 204.63
-----------------------------------
---------------------------------
5376 El Largo 240.70 17.74 201 0.00 4.
------------------
--------------------------------------------------
5387 El Largo 81.12 1.63 5.46
---------
-----------------------------------------------------------
5392 El Rey 182.00 205.00m
Expansion
of the PDF Deposit: The PDF deposit, located 10
kilometres north of the Vault proposed open pit,
was expanded by
drilling in late 2004. Curtis, B. QA/QC programs employ random insertion of four
internal
standards, field duplicates and blank samples.waypoint resman
Results from 20 new exploration holes
are attached along with
Drill Location Plans and a Deposit Location Map.00 205. Preliminary testing
has indicated that
hydrometallurgical techniques can be used to treat the mineralization
at Campo
Morado, and a more detailed evaluation of these techniques is
currently underway.R.60 392.05 0.50
4.61 3.
--------------------------------------------------------------------
5391 El Largo
319.82
--------------------------------------------------------------------
5392 El Rey 198
.75 1. Process design was completed
by International Metallurgical and Environmental Inc. A 2.com
/database/fax/2000/clg3.ccnmatthews.pdf
http://www2.resman bfk
07 11.
There is no known ore at Campo Morado
and there is no assurance that
the mineralization at Campo Morado will ever be classified as ore
.88
--------------------------------------------------------------------
4368 G9 284.61
0.40 0.76
--------------------------------------------------------------------
5375 Reforma
metallurgical hole, not completed
--------------------------------------------------------------
------
5376 El Largo 196.70 2.6 0.29 3.00 55.42 5.69
---------------------------------
-----------------------------------
5376 El Largo
Incl.4 0.20 0.70 196.0 1.60 78 0
.46 60 0.
Meadowbank Gold Project Production Profile(i)
---------------------------------
-------------------------
Open Pit Mineral Reserves 2,768,000 ounces
(Proven and
Probable)
----------------------------------------------------------
Mine Throughput
2.00m at 276m
below surface
Hole G95-073: 3.75 metre down-hole lengths.cleanliness plasturgie
Progress continues to be made
in all areas of
the project's development. Assays are pending for 12 exploration and 6 metallurgical
holes and will
be released when received.3 1.14 152 0.32 6.42 5.15 7.00 7.00 23.Eng. Such funding may not be
available to the Company on acceptable terms or on any terms at all.32 6.47
----------------
----------------------------------------------------
4369 Reforma metallurgical hole
-------
-------------------------------------------------------------
4370 G9 132.50 2.66 108 0.
251.15 2.50 231.85
--------------------------------------------------------------------
5389
El Largo 207.41 0.14
--------------------------------------------------------------------
5389
El Largo 237.70 131 0.Cumberland Announces 2005 Meadowbank Exploration Program
73 Mtpa
----
------------------------------------------------------
Mine Life
8., President and CEO
Forward Looking Statements and Risks - This News Release contains
"forward-looking statements", including, but not limited to,
statements regarding our expectations
as to the market price of gold,
strategic plans, future commercial production, production targets
and
timetables, mine operating costs, capital expenditures, work
programs, exploration budgets
and mineral reserve and resource
estimates. Assumptions include a long term gold price of
US$400
/oz. PDF deposit resources are
not included in the feasibility study of the Meadowbank project.peo plasturgie
Seventy-three holes, including 56 exploration, 4 geotechnical and
13 metallurgical, have been
drilled and assayed since site activities
recommenced at Campo Morado in August 2004.72 25.70
17.56 5.03 11.05
---------------------------------------------------------------------
Metallurgical
testwork is underway at G + T Laboratories in
Kamloops, British Columbia and SGS Lakefield's (SGS
) testing facility
in Lakefield, Ontario.56 5.61 0.6 0.3 0.00 13.18 1.35 8.70 264.79 46 1
.40 2.5 1.00 0. The two phased program, including a planned 7,000 to 9,000
metre diamond drilling
program, is expected to commence in April and
will focus on increasing gold reserves and resources
at Meadowbank.27 1,534,000
Vault 8,469,000 3.37 g/t over 5. Forward
-looking statements express, as at the date of this
report, our plans, estimates, forecasts, projections
, expectations or
beliefs as to future events or results. Interpolation is based on
compositing
at 0.ccnmatthews.tannen bfk
10 145.45 2.88
----------------------------------------------------------------
-----
5376 El
Largo 240.50 276. Zinc and copper metal will then
be recovered by
normal solvent extraction/electrowinning (SX/EW)
processes, and traditional cyanidation techniques
will be applied to
recover the precious metals from the autoclave leach residue.com
ON BEHALF
OF THE BOARD OF DIRECTORS
J.00 1.08 8.03 11.11 7.05
----------------------------------
----------------------------------
5390 El Largo, no significant results, did not intersect massive
sulphides.00 7.05
--------------------------------------------------------------------
No regulatory authority has approved or disapproved the
information contained in this news
release. ("AMEC").surveillances plasturgie
00 38.37
--------------------------------------------------------------------
-
4367 El
Largo
Incl.00 55.02 206 0.75 1.
Flotation testwork on
samples of El Largo, Reforma and Naranjo
drill core is being carried out. As a result,
numerous
"trade-off" studies are underway to ensure that the optimal
development plan is selected for the
Pre-feasibility Study.farallonresources.37
-----------------------------------------------------
---------------
4367 El Largo
Incl.61 57 1.88 1.73 0.03
-----------------------
---------------------------------------------
4370 G9 512.50 8.02 5.98
-----------
---------------------------------------------------------
5376 El Largo 219.56 5.77 47 0.40 232
.65 1. South of the Goose Island deposit,
drilling will test an 850 metre strike length of stratigraphy
where
previous wide spaced drilling has intersected gold mineralization
similar to the Goose Island
deposit.
The Phase II program will consist of up to 2,000 metres of drilling,
grassroots exploration
on favourable structures north of the Vault
deposit, and follow-up exploration on numerous recently
defined
prospects situated both near the proposed open pits and across the
property.
2005
Exploration Targets (See Attached Maps)
Expansion of the Goose Island Deposit: Significant potential
exists to expand the Goose Island deposit (368,000 ounces of gold
reserves) both along strike
and in the down dip direction.77 g/t gold over 3.ccnmatthews.feasability eaf
Assay results from several new
drill
holes have been received and preliminary results of
metallurgical testing are now available.82
7. (Dick) Whittington, President and CEO
Forward Looking Information
This release includes
certain statements that may be deemed
"forward-looking statements. The likelihood of future mining
at Campo Morado is subject
to a large number of risks and will require achievement of a number of
technical, economic and legal objectives, including obtaining
necessary mining and construction
permits, completion of
pre-feasibility and final feasibility studies, preparation of all
necessary
engineering for pits and processing facilities as well as
receipt of significant additional financing
to fund these objectives
as well as funding mine construction.00 285.00 13.28 2.57
--------
------------------------------------------------------------
5378 El Largo 171.09 0.56
-----
---------------------------------------------------------------
5386 El Largo, no significant results
, did not intersect massive
sulphides.88 101 0.00 319.3 4.60 g/t gold over 3.26m
Cumberland
is a well financed mineral exploration and development
company. The Company completed a feasibility
study on the Meadowbank
gold project (100% interest) in Nunavut and is advancing the project
to
production.
Kerry M.feasability turbomachinery
News Editors
VANCOUVER, British Columbia----Farallon Resources
Ltd. Additionally, the
Pre-feasibility Study is offering numerous options for us to consider
as
we develop the optimal overall mine development plan.00 1.1 0.25 46 0.2 0.70 198.62 6.47 3.90
5.78 88 0.64
--------------------------------------------------------------------
5389 El
Largo 232.55 98 0.17 0.50 0.00 3.32 1."
The proven and probable reserve estimate for the
three, shallow
open pits proposed at Meadowbank is as follows:
Meadowbank Gold Project Open
Pit Mining Reserves
(Proven and Probable)(ii)
-----------------------------------------------
---------------
Open Pit Ore (t) Au Grade (g/t) Contained Ounces
---------------
-----------------------------------------------
Portage 11,180,000 4. Wide
spaced
drilling in 2005 will focus on the expansion potential of the
deposit in the down dip direction and
follow up on significant
results from the 2004 program, including:
Hole PDF04-035: 5., Geo.,
is the Qualified Person under NI 43-101. Acme Laboratories of
Vancouver
, British Columbia, provides external reference assaying.com/database/fax/2000/clg2.pdf
Cumberland
Resources Ltd.intrinsic turbomachinery
06 16.66
--------------------------------------------------------------------
4370
G9 248.05 22 6.1 0.70 4.40 82.03 35 0.50 18.6 1.00 23. (TSX:CLG)(AMEX:CLG) is pleased
to
announce a budget of $3.3 year mine life.00. The
Study has been prepared in accordance with
the Standards of
Disclosure for Mineral Projects as defined by National Instrument
43-101 ("NI
43-101").Eng Principal Mining Engineer with AMEC Americas
Limited is the independent Qualified Person
responsible for
preparation of stated reserves. PDF
resource estimates are based on 39 NQ diamond
drill holes and a total
of 1900 samples.
Resource analysis is based on three-dimensional solid
models
generated from geological and assay data.0 g/t cut-off grade is applied.
To view the
maps accompanying this press release please click on
the following links:
http://www2.gundrilling epcot
(TSX:FAN
) -
Persistent Progress Being Made on All Fronts
Dick Whittington, President and CEO of
Farallon Resources Ltd.42 126.70 257. Metallurgical bulk sample drilling has been a key focus
so
far this year and I am very pleased with the preliminary results of
the metallurgical testwork program
, which support our choice of
processing methodology for the project.58 152.13 3.13 12 4.77 298
1.70 208.50 276.06 16.99 195 0.8 1.00 212.22
------------------------------------------------
--------------------
5389 El Largo 227.39 0.51 7.60 2.27 2.65 183.75 per Cdn$1.51m at 132m
below surface
Incl: 13.intrinsic epcot
Working overtime to stay the Web's best reference!
-> Show SiteSeek's List of Web Sites For This Topic (Not Yet Peer Reviewed)
Loading...
(Note: These pages use the Atlas Content Safeguard System (ACSS) and require that Javascript is enabled for viewing.)